The last pic in the Stone Gray color thread is from early Jan of this year! I plan on filling it up once I get mine. Estimated delivery is 6/30-7/6. I go on a three week vacation in mid July so hopefully it arrives before then.
Built faster than my Mach E, which had a blend date of 8/9/21, fully built on 9/15/21, and delivered on 10/19/21.
The estimated delivery of my F-150 to the Seattle area is 6/30-7/6. Seems Ford is getting better at the EV game.
I assume the spray liner added a couple days between the In Production and Built dates…or it could have been the Stone Grey since there are so few with the color. I half expect to spot Iced Silver specks on my paint.
FYI, correcting the spreadsheet, mine is a SR battery and only has the max tow...
Absolutely. I looked into the HIS and determined it would only work for me if I lived in a state with variable rates possibility to feed back into the grid. I had also thought about solar but power in WA is so cheap that solar has a really long ROI. In the end only an interlock, and now transfer...
Doh! Hmmm that also doesn’t look bad, certainly cheaper than the Sunrun setup. Will have to think about it though since on average we have one or two outages a year less than 30 min each.
It’s happening, the Lightning is real so have to prepare. 5/16 blend date. Today installed an interlock kit (inlet, breaker, panel interlock). About $200 in parts. Installed the EVSE for the Mach E a year and a half ago.
Canopy and felt bed liner might be next. All-weather tires and...
Didn’t think to mention it earlier this week but mine is showing up on my dealer’s site with a 10k markup lol. I’ve bought my last three vehicles from this dealer so I will give them the benefit of the doubt that they are just using my truck to gauge the market and potential markups once people...
Mine is also showing up at the dealership with a +$10k markup. I also have a no ADM commitment from the dealership, just as they did with my Mach E. My theory is that dealer is testing the waters for how much people are willing to pay over MSRP once they start getting declined orders.
Smart I...
Not sure if Ford has changed things, but my Mach E never showed "in production" it jumped from "scheduled for production" to "built" one month after the scheduled for production week. So I have low expectations of seeing a change this week, will share if there is movement though.
Not sure what all the sequence numbers mean but here's my info:
Dealer Priority: N
Location: WA
Est. Build Week: 5/16
Blend Day: 5/16
Trim: Lariat
Color: Stone Gray
Battery: SR
Towing Package: Max Tow
Last 6: G05XXX
Sq-1: 17452
Sq-2: 8141
Sq-3: 244
Total Prod Week: 301
I assume this means...
I had this discussion with a co-worker. He mentioned an uncle who used a wood stove, refusing to use natural gas, until the day he died cause he believed the Soviet commies could reverse the flow with back pressure and blow up all our homes. Sigh.
This discussion also brings to mind a news...