Sponsored

Ordered but no build date.. should "Place Order" be checked? Mine still says in progress

SeanOC

Well-known member
Joined
Jan 4, 2022
Threads
10
Messages
132
Reaction score
93
Location
LINY
Vehicles
‘18 Raptor ‘21 Tesla Model Y
Occupation
Pilot
Wave 3 invite and placed order on that day. I did have my dealer add max towing and remove spray in liner about a month ago. Now I am wondering if it should say "in progress" under place order? Probably just being paranoid..

Ford F-150 Lightning Ordered but no build date.. should "Place Order" be checked?  Mine still says in progress Screenshot (9)
Sponsored

 

sotek2345

Well-known member
First Name
Tom
Joined
Jun 7, 2021
Threads
30
Messages
3,668
Reaction score
4,289
Location
Upstate NY
Vehicles
2022 Lightning Lariat ER, 2021 Mach-e GT
Occupation
Engineering Manager
No, that doesn't switch until you hit your production start date.
 
OP
OP
SeanOC

SeanOC

Well-known member
Joined
Jan 4, 2022
Threads
10
Messages
132
Reaction score
93
Location
LINY
Vehicles
‘18 Raptor ‘21 Tesla Model Y
Occupation
Pilot
OK great, thanks bud
 

pstansel

Well-known member
First Name
Paul
Joined
Sep 13, 2021
Threads
5
Messages
317
Reaction score
297
Location
Tolland, CT
Vehicles
F150 Lightning Lariat ER, Hyundai EV6
Occupation
Engineer
Not quite... It switches when you are assigned your production start date, not once you hit it. It will then tell you the date.
Sponsored

 
 





Top