RossRR
Well-known member
Currently Platinums are more like 6-9 months. Check out the most recent build week threads here. My Lariat ordered mid-November has an estimated delivery of mid-May.Good evening all. So I’m about to make an order for a F150 power boost lariat high. Pretty much loaded. I’m deciding maybe going for a platinum although I really don’t want that huge platinum badge on the tailgate. (First world problems) lol. What would you guys guess the timeline for a build would be? I realistically don’t want to take delivery until June at the earliest. (Long story) dealer told me he was thinking about 3 months give or take. Thankfully they are selling at x-plan so that’s good.
Sponsored