Tony Burgh
Well-known member
- First Name
- Tony
- Joined
- Sep 28, 2021
- Threads
- 18
- Messages
- 876
- Reaction score
- 997
- Location
- Western Pennsylvania
- Vehicles
- 22 Lariat ER
- Occupation
- Retired
Mine is 5/16/2022
Sponsored
Priority code 19. My understanding is that your priority code is only going to give you an advantage within your dealership among others with the same build.was wave 2, priority code 10, atlas blue lariat er max tow but had at tires and bedliner. that couldn't be the difference can it? what was your priority code?
Same, 1/20/2022 order date - switched from XLT SR to Lariat ER with spray-in.Week of 5/16 for me, Lariat/ER with Spray in liner (Wave 2)
so much for the "Spray-in will slow it down" crowd. Seems like those are before the with outs.Same, 1/20/2022 order date - switched from XLT SR to Lariat ER with spray-in.
Looks like 5/16 might be Lariat ER SoCal week. Got spray in as well but in carbonized gray.Week of 5/16 for me, Lariat/ER with Spray in liner (Wave 2)
Hopefully that also means we get official EPA rating soon.Hopefully this means that we'll be seeing some media drive reviews in early April.
Do we know roughly how long to expect between the production date and delivery date?I guess Ford was spot on about “spring 2022” deliveries! Good job!
Mach-e timing was around 2 months. Some shorter, some much longer if you got a chip hold (some with chip holds from October are still waiting). Should be little faster for the Lighting since it isn't shipping from Mexico and will likely go out with regular F150s instead of waiting for full truck / railcar loads.Do we know roughly how long to expect between the production date and delivery date?