personalt
Well-known member
Respectfully, you are wrong. No electrician is going to care what is in some sunrun brochure says if they even read it. They are going to care what the electric code says. Requiring more then a 200 amp service would never be applicable for a charger pulling power to charge the car. Never would more power off the pole be needed. A higher amp panel would only be needed if the car is able to feed back in to house while house is still hooked up street (like a tesla power wall or solar install).You realize Pioneer74 is a Ford employee in Dearborn at the Rouge production line right? You know, the facility where these Lightnings are being manufactured? Also, no electrician is going to install the necessary equipment against recommendations of Ford or Sunrun because their butts would be on the line as well…Oh and nice plug about the cost of your house. Really impressive man.
And funny that you mention people doing things without thinking about potential future consequences. In addition to considering those, I also like to post with up to date, knowledgeable, and accurate information.
Sponsored