p52Ranch
Well-known member
I wish we had better insight as to the post production activities including scheduling and shipping. Looks like we have just over 2/3 of our build week shipped.
I am assuming on mine that it is waiting on the next railcar to be loaded that will be heading to Oklahoma City. But it would be nice to know how the plan/schedule is laid out. In the meanwhile my XLT is asleep in Lot G waiting to be moved to the railcar loading lot.