jredondox
Well-known member
- First Name
- Jorge
- Joined
- Feb 12, 2021
- Threads
- 5
- Messages
- 295
- Reaction score
- 427
- Location
- San Diego, CA
- Vehicles
- 2021 F150
I got my vin number and built date 5/16!!! Lariat f
Sponsored
I'll have to go check out the spreadsheet, but did anyone order a Lariat SR? Maybe a few were ordered, but that combination was hard to swallow money wise. The $10K upgrade on the Lariat was some of the best money spent when moving between trims - you got the bigger battery and all of the options between the two Lariat packages.I think it's the SR rather than the trim because there don't seem to be any Lariat SRs reported. But then no XLT ER's either...however very small sample set on those.
Out in the cold on initial scheduling dayI'll have to go check out the spreadsheet, but did anyone order a Lariat SR? Maybe a few were ordered, but that combination was hard to swallow money wise
Could you order the Lariat SR with a moonroof? I’m thinking now the difference could be the moonroof. If every order scheduled has the moonroof it could be that’s a change in the body so they’ll run through all those and then switch to the solid roof body (which coincidentally is also the less profitable trim).Out in the cold on initial scheduling day
Nope, need to step up to an ERCould you order the Lariat SR with a moonroof? I’m thinking now the difference could be the moonroof. If every order scheduled has the moonroof it could be that’s a change in the body so they’ll run through all those and then switch to the solid roof body (which coincidentally is also the less profitable trim).
Maybe the early builds will be double and checked for quality before shipping, so Ford doesn’t get bad press when they hit the streets. Then they can ramp to high production.Well I'd like to thank the rich folks for having theirs built first and letting their trucks be the test dummies for the assembly like while they work out the glitch's. That way we poor folks have quality Pro and XLT builds.
Sorry lol.. had to make my jealous self feel better about not getting scheduled yet.
I sincerely hope all ur builds come out great though. Kinda glad mine isn't first up in line so I can get after July 1st for IL EV credit ...just hope it isn't delayed too long.
About 2 weeks later if there are no delays, at least that’s how it was with my ICE coming from Dearborn to California.My build is scheduled for 4/18, does anyone have a general idea how long after the build process starts before the truck is delivered? My dealer said hopefully at some point in June, but I was thinking surely it won't take that long, maybe May? Thanks in advance.
* Lightning Change Request Form <-- Link to submit edit request for your submitted order info. |
Just sent the update to the Lighting Orders with my VIN and estimated build date.I hope to see more reports today from folks, concentrated in this thread so that I can update my stand-alone tracker.
Note, I have captured several of you folks who never registered in either the Reservations list or the Order list, at this point kind of moot to input a record on reservations, but if you could please create your record in LIGHTNING ORDERS!
Those who already have a record, update it with your ESTIMATED BUILD DATE
* Lightning Change Request Form <-- Link to submit edit request for your submitted order info.
At the moment about 20% of the reported ORDERS now have Scheduled build dates, the trend continues to be Platinum's and Lariat-ER's.
55% have the Max Tow Package.