metroshot
Well-known member
- First Name
- Pat
- Joined
- Aug 26, 2021
- Threads
- 97
- Messages
- 2,127
- Reaction score
- 1,749
- Location
- Montclair, CA
- Vehicles
- 2022 Lariat F150L + 2023 MME
- Occupation
- Networking Tech
This is correct!Based on the data of MY22 and various waves of production stalls due to commodity constraints (not necessarily a chip) I've seen a sequence of trucks stall then when the BUILT dates begin to post is not in build sequence, but pretty random, based on exactly how the trucks are parked in a holding coral, those in the back row of a column of trucks might not get touched as quickly as the ones parked closer to the front.
My 2022 Lightning (wave 4) skipped a lot of those waiting on Ramp 51 for months from very early orders.
Seemed like Ramp 51 was a forgotten black hole for those trucks that got stuck there.
My Lariat was built and shipped within 6 weeks of production build week (first notification after dealer accepted the order).
There was no delay for mine and no sitting on a ramp either.
I think mine was one of the quickest to get delivered too - 14 days from MI to CA via Union Pacific.
Sponsored