Sponsored

Time between production & delivery?

world2steven

Well-known member
Joined
Mar 22, 2022
Threads
23
Messages
109
Reaction score
17
Location
tucson AZ
Vehicles
22 Lightning
Looks like it can run anywhere between 2 and 6 weeks. For the 22MY is it likely to be faster or longer?
Sponsored

 

Labs4Lightning

Well-known member
First Name
C
Joined
Mar 30, 2022
Threads
22
Messages
774
Reaction score
688
Location
Maryland
Vehicles
19 150 lariat, 22 lightning lariat blend 4/18/22
There’s a small group of us that this week will be 90+ days, not shipped. Just outlier. Just sayin.

but we like to whine - cuz we think it’s funny when others complain at 40 days. 😀
 

metroshot

Well-known member
First Name
Pat
Joined
Aug 26, 2021
Threads
97
Messages
2,127
Reaction score
1,747
Location
Montclair, CA
Vehicles
2022 Lariat F150L + 2023 MME
Occupation
Networking Tech
Really depends on many variables - order date, trim, options, delivery mode, etc...

I was a very lucky order when my order on 4/20 went into production on 6/24 and built on 7/2.

Looking at the reported orders, mine might be a smidge over 30 days from production to delivery - same as @XLT Jeffy

Mine should be here this coming week (Ford says 7/22-7/28).
 

RDeFran

Well-known member
First Name
Rich
Joined
Apr 12, 2022
Threads
5
Messages
179
Reaction score
257
Location
37932
Vehicles
2020 GMC Sierra 3500HD AT4 SRW Duramax, 2010 M3
Occupation
Technician
90+, don't bother trying to predict.
 

Sponsored

merek

Well-known member
Joined
May 28, 2022
Threads
22
Messages
249
Reaction score
239
Location
Buffalo, NY
Vehicles
F150 Lightning Lariat ER [6/20]
I think this has happened in other vehicle rollouts, where the first production gets stuck behind newer production. I wouldn't really take the outliers of people who are justifiably grumpy as the norm.

Last weeks production has been looking very promising so far, will be interesting to see if that follows through to shipping and delivery.
 

Labs4Lightning

Well-known member
First Name
C
Joined
Mar 30, 2022
Threads
22
Messages
774
Reaction score
688
Location
Maryland
Vehicles
19 150 lariat, 22 lightning lariat blend 4/18/22
90+, don't bother trying to predict.
Yea‼ you tell ‘em. 4/20 blend, today is day 88. Still days away from shipping if I’m lucky. + shipping days on back end . And we won’t be getting a letter sorry for the inconvenience here’s a gift card like the june deliveries.
yup @RDeFran rich & I are frustrated. What, just because we are lucky to have orders we can’t be a little miffed that we are waiting an extra 60 days more than most.

hey @Ford Motor Company how about a listen.
 

Labs4Lightning

Well-known member
First Name
C
Joined
Mar 30, 2022
Threads
22
Messages
774
Reaction score
688
Location
Maryland
Vehicles
19 150 lariat, 22 lightning lariat blend 4/18/22
I think this has happened in other vehicle rollouts, where the first production gets stuck behind newer production. I wouldn't really take the outliers of people who are justifiably grumpy as the norm.

Last weeks production has been looking very promising so far, will be interesting to see if that follows through to shipping and delivery.
Yes we are outliers and grumpy. But not the norm.
 

RDeFran

Well-known member
First Name
Rich
Joined
Apr 12, 2022
Threads
5
Messages
179
Reaction score
257
Location
37932
Vehicles
2020 GMC Sierra 3500HD AT4 SRW Duramax, 2010 M3
Occupation
Technician
The Bronco was the same mess. By the time it showed I did not even care about it anymore. 22 models were delivered before my 21. Kept it 6 months, put 1100 miles on it and sold. Ford sent emails offering Fordpass points that were never able to be collected, I even have two more Broncos reserved and ordered of thier first respective days. No VIN, no contact, no build, they are sitting in my reservation status unloved.

Apparently a quarter million dollars of vehicle purchases don't matter.
 

TaxmanHog

Moderator
Moderator
First Name
Noel
Joined
Jan 19, 2022
Threads
168
Messages
11,998
Reaction score
12,562
Location
SE. Mass.
Vehicles
2022 Lightning Lariat-ER Max Tow & 2024 Harley-Davidson Road Glide CVO-ST
Occupation
Retired
 





Top