Congrats on moving to Built! Does that estimated delivery show on your tracker or did that come via a "Built" email? I'm still "stuck" on Built without a delivery date estimate.Time to step up my charger install window. Estimated delivery is 1/5-1/11. i did not think there was any chance of January delivery.
Look like those with in production from 12/12 week might made the cut before the shutdownI also moved to built this morning with a date of 12/26. Blend was 12/16, in production was 12/19
Seems to be all over the place. 12/14 Production, 12/23 Built but here's my status:I guess I missed the boat. My pro with a 12/15 blend and 12/17 in production is stuck saying still just in production. I hope there isn’t a chip hold. I wouldn’t have expected that for the base truck but I do have the tow tech, max tow, and pro-power upgrades.
Not sure if ramp 51 is so bad. I tried to search but getting mixed information. It’s the final ramp the truck goes to get prep for shipping and some said it’s for trucks that is on chip hold. Possibly it’s for both so maybe nothing to be concern about.Seems to be all over the place. 12/14 Production, 12/23 Built but here's my status:
Ford CS didn't indicate a chip hold, but the truck is on the dreaded Ramp 51 *gulp*. Waiting to hear back from my dealer for more details... I also have both Towing packages and PPO on an XLT SR.
Yeah, I'm not sure how much credit to give this delivery estimate anyway. I'm 12/17 Production, 12/26 Built and it says:Seems to be all over the place. 12/14 Production, 12/23 Built but here's my status:
Ford CS didn't indicate a chip hold, but the truck is on the dreaded Ramp 51 *gulp*. Waiting to hear back from my dealer for more details... I also have both Towing packages and PPO on an XLT SR.
My email came the day after my estimated delivery showed up on my order status.Delivery estimate is from my Ford Account. Nothing via email at all so far.
Congratulations! My dates are identical to yours…still “in production”My order switched to built this morning. Right on schedule.
Blend 12/17, in production 12/19, built 12/28.