I believe there is a need to get the held inventory out of the Rouge and its adjacent holding lots and finished and onto transports, there is an alleged shortage of "CHIPS" but the article was talking about ICS F150's, but some here have speculated in other threads it extends to the Lightning as well.What's causing the paused production?
Once they have those older builds completed and shipped out and if any stocks that are low have been replenished, they will be in a good position to focus directly in regular main line production with a high %% rolling straight to the rail cars or after minor finishing touches (bed liners, etc).
A while ago there was speculation the holiday week would be either down time for the crew to rest synchronized summer leave for mostly everyone, OR they are going to focus on a huge FLEET ORDER, I have nothing to back either theory other than knowing that factories are known to do brief leave shut-downs
Sponsored
Last edited: