Hopefully 1-15 days to get loaded onto a rail car, all depending on routes ready to load now and daily as time goes on.Looked like a few people in the 7/31 and 8/7 threads were showing a "built" status, which implies that they're getting ready to ship, right?
We're not certain if the CSP is being address at the factory.
Sponsored