Spray-in liner does not cause delays, per dealer

Stlww18

Well-known member
Joined
Apr 12, 2022
Threads
21
Messages
296
Reaction score
417
Location
St. Louis
Vehicles
2022 Lightning Pro, 6/3 blend date
I called my dealer (shortly before I received my build date) and asked if the spray-in liner on my Wave 1 Pro SR could be causing delays in build date. It took him a while to hear back, but Ford told him the liners are only causing delays on Raptors, not lightnings.

I know there aren't many people who can still configure an order at this time, but for anyone changing an order to get rid of the liner, what I'm hearing is it doesn't alter your build time.
Sponsored

 

metroshot

Well-known member
First Name
Pat
Joined
Aug 26, 2021
Threads
97
Messages
2,127
Reaction score
1,749
Location
Montclair, CA
Vehicles
2022 Lariat F150L + 2023 MME
Occupation
Networking Tech
Interesting!

I thought the more you added onto build, causes more delays as the assembly lines have to deal with more items.

I ordered my Lariat F150L base stock - no mods - no options - no dealer installed options.

Figured it would be faster to build a base vehicle.

Someone should post a data collection poll on how long their configured vehicles took from ordering to production date to delivery....

The only options I would want after delivery is the Ford safe vault option.
 

p52Ranch

Well-known member
First Name
Bryan
Joined
Aug 5, 2021
Threads
19
Messages
742
Reaction score
1,212
Location
OK
Vehicles
XLT Lightning, Badlands 7MT, New Holland 4030
I have a Wave 2 XLT SR with spray in bed liner which is scheduled for a 5/30 build week. Just one data point but the spray in bed liner did not cause me to not get scheduled.

After the truck in built, it is sent off-site to get the spray in bed liner installed so that will add at least one day to the truck production.
 

Vorador

Well-known member
Joined
May 27, 2021
Threads
5
Messages
218
Reaction score
294
Location
California
Vehicles
F150 Lightning, Ford Escape
I'm guessing Ford is going to prioritize the Lightning for everything, and try to ship them out as fast as they can. Wouldn't be surprised if we see 2 weeks from build complete to delivery to dealership.