data003
Well-known member
- Thread starter
- #1
So I’ve currently got 100A service. Obviously that’s going to need upgrading. My options are,
1. Add a second meter, 200A service. This option is easier to install and cheaper. If I go with this option I could use the 7.2k 30A plug in the bed to hook up to a transfer switch on my old panel and get backup power but it wouldn’t be automatic or convenient.
2. Upgrade my existing service to 400A or 320A, this is at least a couple grand more expensive because the meters are much bigger. In theory I could integrate this with the Sunrun equipment though and get all the cool automatic transfer features.
Thoughts? Originally I was leaning toward option 1 but now I’m second guessing myself.
I wish they had some specs out on the Sunrun equipment so I could figure out the technical details and costs.
edit: fixed incorrect bed power kW
1. Add a second meter, 200A service. This option is easier to install and cheaper. If I go with this option I could use the 7.2k 30A plug in the bed to hook up to a transfer switch on my old panel and get backup power but it wouldn’t be automatic or convenient.
2. Upgrade my existing service to 400A or 320A, this is at least a couple grand more expensive because the meters are much bigger. In theory I could integrate this with the Sunrun equipment though and get all the cool automatic transfer features.
Thoughts? Originally I was leaning toward option 1 but now I’m second guessing myself.
I wish they had some specs out on the Sunrun equipment so I could figure out the technical details and costs.
edit: fixed incorrect bed power kW
Sponsored
Last edited: