When will Wave 1 or 2 be Scheduled for Production?

MickeyAO

Well-known member
First Name
Mickey
Joined
Apr 2, 2020
Threads
26
Messages
1,050
Reaction score
2,098
Location
San Antonio Tx
Vehicles
Rapid Red Lightning Lariat ER, Kia EV6 GT-Line AWD
Occupation
Retired Lab Manager of the Energy Storage Technology Center
I know we have a couple of members that work at the factory level or have insight into factory level production...when do you expect wave 1 and/or 2 to be scheduled for production?
Sponsored

 

Pioneer74

Well-known member
Joined
Aug 16, 2021
Threads
32
Messages
3,587
Reaction score
6,383
Location
Dearborn
Vehicles
2022 Lightning Lariat ER - 2022 Mach-E Premium
Occupation
Electrician
My dealers mannequin was scheduled for it's build week of March 28th on January 7th. Roughly 11 weeks. We are still hearing Job1 will be around the middle of April. If that holds true, following the mannequin scheduling, wave 1 orders should start scheduling around the beginning or middle of February.
 

SmoothJ

Well-known member
First Name
John
Joined
Dec 22, 2021
Threads
61
Messages
1,077
Reaction score
791
Location
New Jersey
Vehicles
2022 F150 Lightning
How does Ford usually schedule builds anyway? Do they go by trim, paint color, etc?
 

broncoaz

Well-known member
Joined
Jan 6, 2022
Threads
11
Messages
564
Reaction score
480
Location
Cape Cod, MA
Vehicles
2021 Bronco 2 door Badlands manual
With the Bronco is has been all about constraints, they build what they have parts to build. Ford has sent out emails suggesting people swap to a soft top, 2.3L engine, non Sasquatch, no tow package, etc along the way to get orders satisfied. If the ER battery is constrained they they will build mostly SR trucks to keep the lines moving. If some Pro specific part is constrained they will build something else. If some component shared across all models is constrained I’m assuming they‘ll build the highest profit Lariat and Platinum models first.
 

Sponsored
OP
OP
MickeyAO

MickeyAO

Well-known member
First Name
Mickey
Joined
Apr 2, 2020
Threads
26
Messages
1,050
Reaction score
2,098
Location
San Antonio Tx
Vehicles
Rapid Red Lightning Lariat ER, Kia EV6 GT-Line AWD
Occupation
Retired Lab Manager of the Energy Storage Technology Center
OK...I'll stop refreshing my order page twice a day for this week :ROFLMAO:
 
OP
OP
MickeyAO

MickeyAO

Well-known member
First Name
Mickey
Joined
Apr 2, 2020
Threads
26
Messages
1,050
Reaction score
2,098
Location
San Antonio Tx
Vehicles
Rapid Red Lightning Lariat ER, Kia EV6 GT-Line AWD
Occupation
Retired Lab Manager of the Energy Storage Technology Center
And here I thought that stopped once you got the invite. ?
Always looking for that next checkmark! ;)
Once I have it, I'll start the refreshing all over again looking for the 'In Production' checkmark.
 

Sponsored

jazzmanmonty

Well-known member
First Name
Chris
Joined
Oct 25, 2021
Threads
26
Messages
482
Reaction score
522
Location
60480
Vehicles
Lincoln Corsair
Occupation
self employeed
Does anyone have an order sheet that shows their order being Job #1?

I've only seen a couple posted on here and they all say job #2, including mine. Someone on here said a while ago all Lightnings are job 2..just wanted to confirm because I read on an MME forum, some orders were Job 1, others were Job 2..
 

frautumn

Well-known member
First Name
Fred
Joined
Jun 18, 2021
Threads
6
Messages
302
Reaction score
286
Location
Northern CA
Vehicles
2022 Ford F-150 Lightning Lariat
What does Job 1/2 mean?
 

sotek2345

Well-known member
First Name
Tom
Joined
Jun 7, 2021
Threads
30
Messages
3,700
Reaction score
4,351
Location
Upstate NY
Vehicles
2022 Lightning Lariat ER, 2021 Mach-e GT
Occupation
Engineering Manager

greenne

Well-known member
First Name
Nathan
Joined
Jul 13, 2021
Threads
27
Messages
1,894
Reaction score
2,306
Location
Niskayuna, NY
Vehicles
2022 Lightning (Ordered 6/19, delivered 10/28/22)
Does anyone have an order sheet that shows their order being Job #1?

I've only seen a couple posted on here and they all say job #2, including mine. Someone on here said a while ago all Lightnings are job 2..just wanted to confirm because I read on an MME forum, some orders were Job 1, others were Job 2..
I thought Quality was Job#1?