• Welcome to F150Lightningforum.com everyone!

    If you're joining us from F150gen14.com, then you may already have an account here!

    If you were registered on F150gen14.com as of April 16, 2022 or earlier, then you can simply login here with the same username and password!

Sponsored

Ready For The Ford 80A Charge Station Pro

jefro

Well-known member
Joined
Oct 28, 2021
Threads
3
Messages
699
Reaction score
231
Location
Texas
Vehicles
F150, Corvette, Bolt EV,
https://www.txu.com/en/savings-solutions/renewable-energy/electric-vehicle-resources.aspx

My phone app has the breakdown for how power is used. I suspect it is pretty accurate. Big very old hungry water heater shows up as $30 a month. Whacky old big fridge takes another $30.

Hoping for a hybrid water heater if they ever go on sale again. Swap fridge out with modern. Just replaced one of the HVAC's with a heat pump and freed up 65 A in panel.
Sponsored

 

Ken

Well-known member
First Name
Ken
Joined
Dec 29, 2021
Threads
9
Messages
273
Reaction score
241
Location
Monterey
Vehicles
Lightning Lariat ER
Does anyone have an actual reservation to install one of these? With vehicles under production starting this week, we should have people with reservations and firm price estimates by now I would hope.
 

Labs4Lightning

Well-known member
First Name
C
Joined
Mar 30, 2022
Threads
21
Messages
773
Reaction score
686
Location
Maryland
Vehicles
19 150 lariat, 22 lightning lariat blend 4/18/22
Can you confirm which provider offers this service? There are TOU plans available, but all I've seen to date are simply that, different rates based on times. I've not seen any plan that can determine if you have an EVSE plugged in.
my utility in Maryland offers TOU with certain level 2 chargers. These are WiFi connected chargers, so utility is interfacing with those manufactures. in MD Tesla chargers use a 3rd part app that “I think” accesses their Tesla account to determine time of day charger was in use and reports to utility.
 

Carminus

Well-known member
First Name
Paul
Joined
Nov 22, 2021
Threads
4
Messages
110
Reaction score
182
Location
NJ
Vehicles
2008 Jeep Grand Cherokee
Occupation
IT
I got a quote from a local electrician...$4300 for a new panel going from a 150amp service to a 200amp service. The panel is full but the main run is on the opposite side of the panel, so its a short run.

Ford F-150 Lightning Ready For The Ford 80A Charge Station Pro 1649963482970


I have another coming out this weekend for est.
 

jefro

Well-known member
Joined
Oct 28, 2021
Threads
3
Messages
699
Reaction score
231
Location
Texas
Vehicles
F150, Corvette, Bolt EV,
Sure would be nice if those guys would show material and labor in their quotes.
 

Sponsored

blpublic

Well-known member
First Name
Brian
Joined
Nov 18, 2021
Threads
3
Messages
55
Reaction score
58
Location
Missouri
Vehicles
2016 F150 XLT
Does anyone have an actual reservation to install one of these? With vehicles under production starting this week, we should have people with reservations and firm price estimates by now I would hope.
I am wondering then same. Our Lightning “roll down the line” date is 4/22 - only a week away.
Both Ford and Sunrun can’t even confirm who will deliver the CSP that comes with our ER edition. We already have the 240v 100a 3-wire work done if our electrician could have all the details.

I’m not going be happy if we have to wait for the equipment after the truck arrives. Why not allow us to get it now via refundable deposit held until we take delivery of the truck. The dealer doesn’t know either.
 

Maquis

Well-known member
First Name
Dave
Joined
May 20, 2021
Threads
8
Messages
3,246
Reaction score
4,030
Location
Illinois
Vehicles
2021 Mach-E E4-X; 2023 Lightning Lariat ER
I got a quote from a local electrician...$4300 for a new panel going from a 150amp service to a 200amp service. The panel is full but the main run is on the opposite side of the panel, so its a short run.

1649963482970.png


I have another coming out this weekend for est.
An 80A branch circuit with #4 wire will not allow the Charge Station Pro to operate at full output. It needs to be a 100A circuit with #3 wire.
 

Carminus

Well-known member
First Name
Paul
Joined
Nov 22, 2021
Threads
4
Messages
110
Reaction score
182
Location
NJ
Vehicles
2008 Jeep Grand Cherokee
Occupation
IT
An 80A branch circuit with #4 wire will not allow the Charge Station Pro to operate at full output. It needs to be a 100A circuit with #3 wire.
Trying to find that info you provided to show the electrician. Does Ford have a document that you found?
 

Maquis

Well-known member
First Name
Dave
Joined
May 20, 2021
Threads
8
Messages
3,246
Reaction score
4,030
Location
Illinois
Vehicles
2021 Mach-E E4-X; 2023 Lightning Lariat ER
Trying to find that info you provided to show the electrician. Does Ford have a document that you found?
My comments were based on my knowledge of the NEC, which treats an EVSE as a continuous load, thus requiring a 20% derate of the branch circuit.

But here is a link to the Ford installation specs calling for a 100A circuit.
 

Carminus

Well-known member
First Name
Paul
Joined
Nov 22, 2021
Threads
4
Messages
110
Reaction score
182
Location
NJ
Vehicles
2008 Jeep Grand Cherokee
Occupation
IT

Sponsored

TaxmanHog

Moderator
Moderator
First Name
Noel
Joined
Jan 19, 2022
Threads
165
Messages
11,517
Reaction score
11,961
Location
SE. Mass.
Vehicles
2022 Lightning Lariat-ER Max Tow
Occupation
Retired

Carminus

Well-known member
First Name
Paul
Joined
Nov 22, 2021
Threads
4
Messages
110
Reaction score
182
Location
NJ
Vehicles
2008 Jeep Grand Cherokee
Occupation
IT
Going to use the included 80amp. My question is when do I get the charger?
 

GDN

Well-known member
First Name
Greg
Joined
Feb 15, 2022
Threads
84
Messages
3,113
Reaction score
3,705
Location
Dallas, TX
Vehicles
Lightning Lariat ER, Performance Y
Occupation
IT
Going to use the included 80amp. My question is when do I get the charger?
When you finalize your truck deal and drive the truck home.
 

blpublic

Well-known member
First Name
Brian
Joined
Nov 18, 2021
Threads
3
Messages
55
Reaction score
58
Location
Missouri
Vehicles
2016 F150 XLT

Maquis

Well-known member
First Name
Dave
Joined
May 20, 2021
Threads
8
Messages
3,246
Reaction score
4,030
Location
Illinois
Vehicles
2021 Mach-E E4-X; 2023 Lightning Lariat ER
Here is the Ford document showing that you need a dedicated 100a 240v breaker to get 80a usable amps. It also says that you can use a 20a-100a breaker which is adjustable in the charge station pro. And, you will get 80% of the breaker amperage as usable. So, if you have an 80a 240v breaker, you should get 64a.
https://www.ford.com/cmslibs/conten...ning/pdf/FordChargeStationPro-Specs_06_v2.pdf
Just a clarification. The EVSE can’t read the breaker size on your circuit. You have to specifically set the switches in the EVSE to limit the charging current.
Sponsored

 
 





Top