Sunrun is trying to schedule the installation of my Ford Charge Station Pro and they are saying they will install on a 50 Amp circuit. My understanding is that it draws 80 Amps, so would be on a 100 Amp circuit. I can't get my Project Coordinator to return my emails or VMs, but the local installer is ready to schedule the install. I know I'd be looking at half the charging time on a 50 Amp circuit, but not sure if the 50 Amp quote is because it won't require a major update to my draw from the city. I can handle the longer charge times, but want to be certain that 50 Amp wouldn't be a problem. Does anyone know the answer? The specs online aren't very clear, and I'm not an electrician, so any advice would be appreciated.