astricklin
Well-known member
For what it's worth, my truck was scheduled 3/13 and it moved one time to 3/27 just after the production halt and it has not changed again despite additional delays to restarting
Sponsored
Mine went from 3/20 to 3/13 right before the shutdown. Now when I check online it says 3/27. They never sent an email update.For what it's worth, my truck was scheduled 3/13 and it moved one time to 3/27 just after the production halt and it has not changed again despite additional delays to restarting
I had a May blend date. Is that why my rear motors have a June date or was that something else?Anyone remember the late summer of 2022 when Ford quietly replaced a number of half drive spline motors in '22 Lightnings held in MI and at rail depots that were attended to by mobile Ford techs ?
That replacement caused a month to 2 months of delay.
So not unusual Ford is going to take their time....
I did not get an email about my reschedule either. You would think their system would automatically fire that off any time it changesMine went from 3/20 to 3/13 right before the shutdown. Now when I check online it says 3/27. They never sent an email update.
As a FCTP buyer with #311 off the line, this makes me feel good. I’ve had zero issues whatsoever.You have to wonder if the earliest built lightnings will be “better quality” when you read
“ it will take time “to ensure they are back to building high-quality cells and to deliver them to the Lightning production line.“
It almost reads like the first run of SK batteries was top notch and now they are cutting corners due to ramping up production. The first 2022s without features missing and lack of widespread battery issues initially (except hoovies garage) as well as the lower price point now make me feel that the earliest adopters really lucked out compared to the current one .
Feels like a rare occurrence where the beta testers and bleeding edge adopters wound up with the best possible scenario.
Same here my friend, no change since somewhere in mid-January (Build date 1/13). Just displaying estimated delivery date of 2/10 to 2/16. Kind of maddening.My estimated delivery date on Ford's website has been 2/7/23 - 2/13/23 ever since my truck's status changed to "built" on January 22nd, and it still has not changed.
IMHO, folks who were scheduled for the weeks starting 2/6, 2/13, and 2/20 will resume in original order kicking off 3/13, 3/20 and 3/27, let's see if this speculation plays out.My 2/13 build date remains unchanged! I'm skeptical...
you are 100% correct! 2022s were carefully QA’ed out of the assembly line - careful attention to everything…You have to wonder if the earliest built lightnings will be “better quality” when you read
“ it will take time “to ensure they are back to building high-quality cells and to deliver them to the Lightning production line.“
It almost reads like the first run of SK batteries was top notch and now they are cutting corners due to ramping up production. The first 2022s without features missing and lack of widespread battery issues initially (except hoovies garage) as well as the lower price point now make me feel that the earliest adopters really lucked out compared to the current one .
Feels like a rare occurrence where the beta testers and bleeding edge adopters wound up with the best possible scenario.
Today I see that mine has been moved from 3/27 to 4/24.For what it's worth, my truck was scheduled 3/13 and it moved one time to 3/27 just after the production halt and it has not changed again despite additional delays to restarting