Aspesi4
Well-known member
I'm debating about what to do now. I'm considering installing a 100A sub panel in my garage with a NEMA 14-50 receptacle. Then when the charge station pro shows up, I can either have it installed right away or use the 14-50 for a while. I need the panel in my garage anyway so that I can add some receptacles to my garage where my workshop is being located due to my Lightning not fitting in that space.For those planning to wire Charge station pro are you...
a) having the electrician come in and do prep work so that when the charger comes in there is minimal work to finish it up with a 2nd trip?
or
b) are you just waiting until you get the Charge Station Pro comes in and then having him do it all in 1 trip?
Sponsored