This is completely fabricated nonsense. Qmerit is a large electrical contractor and has absolutely nothing to do with Sunrun. Sunrun is it's own company and likewise has nothing to do with Qmerit.

For the current problems people are having, remember who Qmerit works for in this. It is not you. Qmerit is being hired and paid for by Ford. Qmerit cannot do anything Ford doesn't let them do. I'd bet good money the problems with getting scheduled are all on Ford.
I contacted SunRun to have them install a new charger. They said they are using Qmerit to do that for them now. Maybe they are separate but they are working with/for SunRun.
Sponsored

 

sfringer

Well-known member
First Name
Scott
Joined
Nov 13, 2023
Threads
2
Messages
110
Reaction score
156
Location
NC
Vehicles
2023 F-150 Lightning Lariat ER
I contacted SunRun to have them install a new charger. They said they are using Qmerit to do that for them now. Maybe they are separate but they are working with/for SunRun.
They do not work with or for SunRun. When I received my FCSP from SunRun I could have chosen any installer to handle the install. There was no connection to Qmerit.
You also need to keep in mind that Qmerit subs out the work to a local electrician who has been vetted by Qmerit. So if there are issues with any of the local Qmerit vetted electricians in your area, that could add delay as well.
Note: I used Qmerit (based on @tommolog recommendation) about a year ago when I had my FCSP installed and this is the process that occurred then.
 

tommolog

Well-known member
First Name
Tom
Joined
Jan 16, 2022
Threads
4
Messages
74
Reaction score
413
Location
New Jersey
Website
www.youtube.com
Vehicles
2022 F-150 Lightning Lariat, 2023 Rivian R1S
Occupation
Journalist
They do not work with or for SunRun. When I received my FCSP from SunRun I could have chosen any installer to handle the install. There was no connection to Qmerit.
You also need to keep in mind that Qmerit subs out the work to a local electrician who has been vetted by Qmerit. So if there are issues with any of the local Qmerit vetted electricians in your area, that could add delay as well.
Note: I used Qmerit (based on @tommolog recommendation) about a year ago when I had my FCSP installed and this is the process that occurred then.
Qmerit is a network of licensed contractors, the same ones that have been operating in your areas for many years. Contractors can apply to join the Qmerit network and, if accepted, undergo training so they can install equipment to Qmerit standards, which are often higher than what a regular electrical contractor uses. For instance, they have to use high-quality industrial-grade outlets, torque wrenches to make sure all the connections are torqued to the manufacturer's specs (this is especially important for EV charging equipment), and only copper wire gets used for charging equipment.

To your point about extra time, it depends on the specific contractor. Quite often followers of mine have reported same-day contact, but it depends on a lot of factors. Overall, my followers are mostly happy with Qmerit, but there are occasional complaints. And that's another good thing about them - you now have a company on top of the contractor to contact and complain to if there is an issue. If Qmerit gets a lot of complaints about any specific contractor in the network, they remove them from it.
 

Charge_Rob

Member
Joined
Nov 25, 2024
Threads
0
Messages
7
Reaction score
11
Vehicles
2024 F-150 Lightning Lariat
Occupation
Charging Nerd
Qmerit is the new name for SunRun - the original installer recommended by Ford for the charging system installation. They changed their name because their reputation is SO bad. That’s all you need to know about them.
This is not true.
This is completely fabricated nonsense. Qmerit is a large electrical contractor and has absolutely nothing to do with Sunrun. Sunrun is it's own company and likewise has nothing to do with Qmerit.

For the current problems people are having, remember who Qmerit works for in this. It is not you. Qmerit is being hired and paid for by Ford. Qmerit cannot do anything Ford doesn't let them do. I'd bet good money the problems with getting scheduled are all on Ford.
Qmerit is a large network of independent electrical sub-contractors.

They don't do the work themselves, they use their network of local electricians. If there is a delay in the process, it is because the local installers in your area are booked up - some areas have installs in a day or two, others in a few weeks. It all depends on how busy the electricians are.
 

Maquis

Well-known member
First Name
Dave
Joined
May 20, 2021
Threads
9
Messages
3,554
Reaction score
4,489
Location
Illinois
Vehicles
2021 Mach-E E4-X; 2023 Lightning Lariat ER
This is not true.

Qmerit is a large network of independent electrical sub-contractors.

They don't do the work themselves, they use their network of local electricians. If there is a delay in the process, it is because the local installers in your area are booked up - some areas have installs in a day or two, others in a few weeks. It all depends on how busy the electricians are.
I saw one person with a new Mach-E state that Qmerit told them they couldn’t find a contractor in their area. They’re trying to get the dealer to change their purchase from charger to dollar credit without much luck.
 

Sponsored

broncoaz

Well-known member
Joined
Jan 6, 2022
Threads
11
Messages
510
Reaction score
429
Location
Cape Cod, MA
Vehicles
2021 Bronco 2 door Badlands manual
I bought my 2024 F150 on 12/5, contacted QMerit on 12/6 and had the local electricians install it on 12/13. I had an extra 40 feet of cable run over the 10 feet included in the basic installation and they charged me an extra $450 here in Michigan.

It was a very smooth process and I was very happy with both QMerit and my local electricians, Bazen Electric.
They told me the basic install was up to 80 feet?
 

aldera

New member
First Name
Ralph
Joined
Dec 10, 2024
Threads
0
Messages
4
Reaction score
4
Vehicles
2024 F150 Lightning Lariat
They told me the basic install was up to 80 feet?
Who's they?

Basic EV Charging Installation
  • Electrical Panel load calculation including an evaluation of power requirements for all existing electrical circuits and electrical appliances used in your home to ensure your charging installation fits within the capacity of your electrical infrastructure.
  • Professional hardwire installation of a customer provided wall-mounted charging station OR installation of a commercial grade NEMA 14-50 outlet for use with a customer supplied Level-2 charging cord
  • Assumes installation location is within 10 ft of electrical panel.
  • Installation of code compliant electrical wiring and conduit including all necessary connectors and couplings.
  • Installation of a new, properly sized breaker to appropriately support the available load and charging amperage output.
  • Power up charging unit and test for proper operation.
  • Project specific clean-up and disposal.
 

Scorpio3d

Well-known member
First Name
Chris
Joined
Mar 18, 2024
Threads
19
Messages
660
Reaction score
723
Location
Texas
Vehicles
2023 Ford F150 Lightning Lariat ER
Occupation
SS/IBA car wash owner
Qmerit is a network of licensed contractors, the same ones that have been operating in your areas for many years. Contractors can apply to join the Qmerit network and, if accepted, undergo training so they can install equipment to Qmerit standards, which are often higher than what a regular electrical contractor uses. For instance, they have to use high-quality industrial-grade outlets, torque wrenches to make sure all the connections are torqued to the manufacturer's specs (this is especially important for EV charging equipment), and only copper wire gets used for charging equipment.

To your point about extra time, it depends on the specific contractor. Quite often followers of mine have reported same-day contact, but it depends on a lot of factors. Overall, my followers are mostly happy with Qmerit, but there are occasional complaints. And that's another good thing about them - you now have a company on top of the contractor to contact and complain to if there is an issue. If Qmerit gets a lot of complaints about any specific contractor in the network, they remove them from it.
Not much different than Ford being the manufacturer and dealers being “independent contractors” some of them are good and some of them are not all depends on who has been hired for various positions within that company!
 

broncoaz

Well-known member
Joined
Jan 6, 2022
Threads
11
Messages
510
Reaction score
429
Location
Cape Cod, MA
Vehicles
2021 Bronco 2 door Badlands manual
Who's they?

Basic EV Charging Installation
  • Electrical Panel load calculation including an evaluation of power requirements for all existing electrical circuits and electrical appliances used in your home to ensure your charging installation fits within the capacity of your electrical infrastructure.
  • Professional hardwire installation of a customer provided wall-mounted charging station OR installation of a commercial grade NEMA 14-50 outlet for use with a customer supplied Level-2 charging cord
  • Assumes installation location is within 10 ft of electrical panel.
  • Installation of code compliant electrical wiring and conduit including all necessary connectors and couplings.
  • Installation of a new, properly sized breaker to appropriately support the available load and charging amperage output.
  • Power up charging unit and test for proper operation.
  • Project specific clean-up and disposal.
I called Qmerit last week and asked what the standard Ford installation included. Read page two of this thread, others had the same information.

https://www.f150lightningforum.com/...er-install-by-qmerit.23338/page-2#post-452942
 

Zprime29

Well-known member
First Name
Brandon
Joined
Jul 26, 2022
Threads
37
Messages
2,033
Reaction score
2,113
Location
Tucson, AZ
Vehicles
2022 Lightning ER, 2025 XC90 Recharge
And that's another good thing about them - you now have a company on top of the contractor to contact and complain to if there is an issue. If Qmerit gets a lot of complaints about any specific contractor in the network, they remove them from it.
I think the problem with the OP is that Qmerit has not assigned him a local contractor yet. Maybe they live in a small town? Still seems odd that Qmerit wouldn't at least say they are having trouble finishing a certified electrician in that area. Something doesn't add up.
 

Zprime29

Well-known member
First Name
Brandon
Joined
Jul 26, 2022
Threads
37
Messages
2,033
Reaction score
2,113
Location
Tucson, AZ
Vehicles
2022 Lightning ER, 2025 XC90 Recharge
You got the FCSP installed with home backup capability for $900??
I don't think I said that, did I? No, my install was just the charger. I was interested in the back up system until others reported so many problems with it. I'm now looking into alternate solutions. I won't do just a subpanel with generator port cuz I want to still be able to use my solar.