PV2EV
Well-known member
I was going to use these in a junction box to transition from AL SER 2-2-2-4 to CU 3 THHN. I changed plans and will install a Chargepoint prior to the CSP, so I am landing the SER in a 125A outdoor Sub Panel for now. This allows me to pull other circuits, and easily change the whip for the CSP install in future.You can transition that last foot or 2 in copper to the hvse. . Check with your electrician.
that’s what I’m doing.
Sponsored