Many on the forum strongly discourage this type of operation. Not sure if the main disconnect would tolerate daily switching.I know I will have to leave the ground disconnected at the PIB to make this work and I could trip the Lightnings 30 amp breaker if we draw over 30 amps. Only thing I haven't thought through is if a 200 main breaker is designed to be turned off repeatedly.
You should consider using a technically safe load transfer setup discussed numerous times in this and other threads, moving the majority of your moderate loads to the Lightning for peak rate shaving.
Sponsored